The long-term power system adequacy analysis of the Baltic countries, which has been carried out for the first time by the electricity transmission system operators of Lithuania, Latvia and Estonia, has shown that the existing double-circuit Lithuanian-Polish power interconnection could be sufficient for the synchronisation of Baltic power systems, after the system is prepared and tested to operate in isolated mode. Moreover, according to the analysis, new reliable and flexibly operating power plants should be built in the Baltic States in eight years to ensure the smooth operation of power systems and the security of supply. The Lithuanian Minister of Energy, Žygimantas Vaičiūnas, says that many inefficient and uncompetitive power plants in the Baltic countries will be closed in the next period and we must agree and decide at the regional level on new reliable, flexible and efficient power generation sources. “We are faced with two alternatives – either to build these sources on a market basis or through state subsidies. The current situation on the market is not encouraging the development of new generation sources, while making a decision on subsidisation is always complicated, therefore, we must prepare for serious discussions”, he underlined. The available data shows that new power generation sources to be built in the Baltic countries by 2032 will have a total capacity of just 272 MW, compared with a total capacity of 2 315 MW of power plants scheduled for closure by this time. CEO of Litgrid AB, a CEEP member, Daivis Virbickas, declares that “beyond 2025, the demand of the Baltic power system reserve will increase from 700 MW to 2 000 MW. In [...]
In a few words
We represent the widely understood Central Europe energy sector (electricity generation, distribution and transmission, renewables, gas, oil, heat generation and distribution, chemical industries, etc.), universities and scientific institutions.